Cabin Life – August 30, 2010

A productive weekend. We continue to set up the infrastructure for our Emergency Power Transfer Switch and Generator. This weekend we got the switch box mounted and pipes for wires in from box to the generator. We took the form off the tractor tent foundation. And we started on the shower pad by the Guesthouse. First we need to build a retaining wall to hold in some rocks and concrete as well as some dirt. Then we will pour the pad on top. Last week we had an thunderstorm with 1.1 inches of rain. We had our concrete covered, but it’s getting pretty hard sometimes and we want to try and use it up next weekend before it goes bad.

[album: https://cielogrande.net/wp-content/plugins/dm-albums/dm-albums.php?currdir=/wp-content/uploads/dm-albums/Cabin Life – August 30 2010/]

Cabin Life - September 7, 2010